SR

Tanush
Tanush
Created on Dec 3, 2025 0 0 0
SR
100%

Procedure

  1. Add IC 74LS02 into ICBase-2 (74LS02).
  2. Add IC 74LS02 into ICBase-3 (74LS02).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS02).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS02).
  7. Connect Output-1 to Pin-1 (Output) of ICBase-2 (74LS02).
  8. Connect Output-0 to Pin-1 (Output) of ICBase-3 (74LS02).
  9. Connect Input-4 to Pin-2 (Input) of ICBase-2 (74LS02).
  10. Connect Input-3 to Pin-2 (Input) of ICBase-3 (74LS02).
  11. Connect Pin-3 (Input) of ICBase-3 (74LS02) to Pin-1 (Output) of ICBase-2 (74LS02).
  12. Connect Pin-3 (Input) of ICBase-2 (74LS02) to Pin-1 (Output) of ICBase-3 (74LS02).