New Circuit

Shahu
Shahu
Created on Nov 5, 2025 1 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  4. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  5. Connect GND Port to Pin-17 (Ground) of ICBase-1 (74LS76).
  6. Connect GND Port to Pin-17 (Ground) of ICBase-2 (74LS76).
  7. Connect Clock port of 1Hz frequency to Pin-1 (Input) of ICBase-1 (74LS76).
  8. Connect VCC Port to Pin-2 (Input) of ICBase-1 (74LS76).
  9. Connect VCC Port to Pin-3 (Input) of ICBase-1 (74LS76).
  10. Connect VCC Port to Pin-4 (Input) of ICBase-1 (74LS76).