New Circuit

Prashant Jadhav
Prashant Jadhav
Created on Oct 18, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-2 (74LS90).
  2. Connect Pin-5 (VCC) of ICBase-2 (74LS90) to VCC Port.
  3. Connect Pin-16 (Ground) of ICBase-2 (74LS90) to GND Port.
  4. Connect Pin-18 (Output) of ICBase-2 (74LS90) to Pin-1 (Input) of ICBase-2 (74LS90).
  5. Connect Clock port of 5Hz frequency to Pin-19 (Input & Output) of ICBase-2 (74LS90).
  6. Connect Input-0 to Pin-2 (Input) of ICBase-2 (74LS90).
  7. Connect Input-1 to Pin-3 (Input) of ICBase-2 (74LS90).
  8. Connect Pin-6 (Input) of ICBase-2 (74LS90) to Input-2.