74LS08 AND Gate

Mubashir Ali
Mubashir Ali
Created on Oct 6, 2025 0 0 0
74LS08 AND Gate
100%

Procedure

  1. Add IC 74LS08 into ICBase-2 (74LS08).
  2. Connect Pin-20 (VCC) of ICBase-2 (74LS08) to VCC Port.
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS08).
  4. Connect Input-15 to Pin-1 (Input) of ICBase-2 (74LS08).
  5. Connect Input-14 to Pin-2 (Input) of ICBase-2 (74LS08).
  6. Connect Output-9 to Pin-3 (Output) of ICBase-2 (74LS08).