New Circuit

GAJRE OMKAR
GAJRE OMKAR
Created on Oct 1, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS32).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS32).
  3. Connect Input-12 to Pin-1 (Input) of ICBase-1 (74LS32).
  4. Connect Input-11 to Pin-2 (Input) of ICBase-1 (74LS32).
  5. Connect Output-11 to Pin-3 (Output) of ICBase-1 (74LS32).
  6. Add IC 74LS32 into ICBase-1 (74LS32).