New Circuit

Enes
Enes
Created on Oct 14, 2025 0 0 4
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Add IC 74LS04 into ICBase-2 (74LS04).
  3. Add IC 74LS32 into ICBase-3 (74LS32).
  4. Connect Pin-20 (VCC) of ICBase-1 (74LS00) to VCC Port.
  5. Connect Pin-20 (VCC) of ICBase-2 (74LS04) to VCC Port.
  6. Connect Pin-20 (VCC) of ICBase-3 (74LS32) to VCC Port.
  7. Connect Pin-7 (Ground) of ICBase-3 (74LS32) to GND Port.
  8. Connect Pin-7 (Ground) of ICBase-2 (74LS04) to GND Port.
  9. Connect Pin-7 (Ground) of ICBase-1 (74LS00) to GND Port.
  10. Connect Pin-3 (Input) of ICBase-2 (74LS04) to Input-13.
  11. Connect Pin-2 (Output) of ICBase-2 (74LS04) to Pin-1 (Input) of ICBase-3 (74LS32).
  12. Add IC 74LS86 into ICBase-4 (74LS86).
  13. Connect Pin-20 (VCC) of ICBase-4 (74LS86) to VCC Port.
  14. Connect Pin-7 (Ground) of ICBase-4 (74LS86) to GND Port.