New Circuit

Pushkar
Pushkar
Created on Oct 5, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS153 into ICBase-3 (74LS153).
  2. Connect GND Port to Pin-8 (Ground) of ICBase-3 (74LS153).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS153).
  4. Connect GND Port to Pin-1 (Input) of ICBase-3 (74LS153).
  5. Connect VCC Port to Pin-19 (Input) of ICBase-3 (74LS153).
  6. Connect Input-2 to Pin-18 (Input) of ICBase-3 (74LS153).
  7. Connect Input-3 to Pin-2 (Input) of ICBase-3 (74LS153).
  8. Connect Pin-6 (Input) of ICBase-3 (74LS153) to Input-0.
  9. Connect Output-0 to Pin-7 (Output) of ICBase-3 (74LS153).
  10. Connect Pin-19 (Input & Output) of ICBase-2 to Input-1.
  11. Connect Pin-17 (Input & Output) of ICBase-2 to Input-0.
  12. Connect GND Port to Pin-7 (Input & Output) of ICBase-2.