New Circuit

Sohan Pawar
Sohan Pawar
Created on Oct 15, 2025 0 0 3
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect Input-10 to Pin-1 (Input) of ICBase-2 (74LS86).
  2. Connect Input-9 to Pin-2 (Input) of ICBase-2 (74LS86).
  3. Connect Output-8 to Pin-3 (Output) of ICBase-2 (74LS86).
  4. Connect Pin-1 (Input) of ICBase-2 (74LS86) to Pin-1 (Input) of ICBase-3 (74LS04).
  5. Connect Pin-1 (Input) of ICBase-4 (74LS08) to Pin-2 (Output) of ICBase-3 (74LS04).
  6. Connect Pin-2 (Input) of ICBase-4 (74LS08) to Pin-2 (Input) of ICBase-2 (74LS86).
  7. Add IC 74LS86 into ICBase-2 (74LS86).
  8. Add IC 74LS04 into ICBase-3 (74LS04).
  9. Add IC 74LS08 into ICBase-4 (74LS08).
  10. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS86).
  11. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS04).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-4 (74LS08).
  13. Connect Output-5 to Pin-3 (Output) of ICBase-4 (74LS08).
  14. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS86).
  15. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS04).
  16. Connect VCC Port to Pin-20 (VCC) of ICBase-4 (74LS08).