New Circuit

ATHARVA DESHPANDE
ATHARVA DESHPANDE
Created on Oct 15, 2025 1 0 3
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-1 (74LS04).
  2. Add IC 74LS08 into ICBase-2 (74LS08).
  3. Connect Input-12 to Pin-1 (Input) of ICBase-1 (74LS04).
  4. Connect Pin-1 (Input) of ICBase-2 (74LS08) to Pin-2 (Output) of ICBase-1 (74LS04).
  5. Add IC 74LS86 into ICBase-3 (74LS86).
  6. Connect Input-8 to Pin-2 (Input) of ICBase-2 (74LS08).
  7. Connect Output-8 to Pin-3 (Output) of ICBase-2 (74LS08).
  8. Connect Pin-1 (Input) of ICBase-3 (74LS86) to Input-12.
  9. Connect Pin-2 (Input) of ICBase-3 (74LS86) to Input-8.
  10. Connect Output-3 to Pin-3 (Output) of ICBase-3 (74LS86).
  11. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS86).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS86).
  13. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS08).
  14. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS08).
  15. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).
  16. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).