New Circuit

Nimish Paikine
Nimish Paikine
Created on Sep 12, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-2 (74LS74).
  2. Add IC 74LS74 into ICBase-3 (74LS74).
  3. Connect Pin-5 (Output) of ICBase-2 (74LS74) to Output-2.
  4. Connect Manual clock Port to Pin-3 (Input) of ICBase-2 (74LS74).
  5. Connect Manual clock Port to Pin-17 (Input) of ICBase-2 (74LS74).
  6. Connect Manual clock Port to Pin-3 (Input) of ICBase-3 (74LS74).
  7. Connect Pin-4 (Input) of ICBase-2 (74LS74) to VCC Port.
  8. Connect Pin-4 (Input) of ICBase-3 (74LS74) to VCC Port.
  9. Connect Pin-5 (Output) of ICBase-2 (74LS74) to Pin-18 (Input) of ICBase-2 (74LS74).
  10. Connect Pin-15 (Output) of ICBase-2 (74LS74) to Pin-2 (Input) of ICBase-3 (74LS74).