New Circuit

Khushi Kharche
Khushi Kharche
Created on Oct 29, 2025 0 0 0
New Circuit
100%

Procedure

  1. Add IC 74LS04 into ICBase-1 (74LS04).
  2. Connect Input-14 to Pin-1 (Input) of ICBase-1 (74LS04).
  3. Connect Output-13 to Pin-2 (Output) of ICBase-1 (74LS04).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).
  6. Add IC 74LS04 into ICBase-2 (74LS04).
  7. Connect Input-8 to Pin-1 (Input) of ICBase-2 (74LS04).
  8. Connect Output-7 to Pin-2 (Output) of ICBase-2 (74LS04).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).