S04

Saliha
Saliha
Created on Oct 7, 2025 0 0 0
S04
100%

Procedure

  1. Add IC 74LS04 into ICBase-2 (74LS04).
  2. Connect Input-14 to Pin-1 (Input) of ICBase-2 (74LS04).
  3. Connect Output-15 to Pin-2 (Output) of ICBase-2 (74LS04).
  4. Connect Input-13 to Pin-3 (Input) of ICBase-2 (74LS04).
  5. Connect Output-13 to Pin-4 (Output) of ICBase-2 (74LS04).
  6. Connect Input-12 to Pin-5 (Input) of ICBase-2 (74LS04).
  7. Connect Output-12 to Pin-6 (Output) of ICBase-2 (74LS04).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  9. Connect Output-7 to Pin-14 (Output) of ICBase-2 (74LS04).
  10. Connect Input-5 to Pin-15 (Input) of ICBase-2 (74LS04).
  11. Connect Input-6 to Pin-17 (Input) of ICBase-2 (74LS04).
  12. Connect Output-6 to Pin-16 (Output) of ICBase-2 (74LS04).
  13. Connect Input-4 to Pin-19 (Input) of ICBase-2 (74LS04).
  14. Connect Output-5 to Pin-18 (Output) of ICBase-2 (74LS04).