BA

Rutika
Rutika
Created on Sep 20, 2025 0 0 0
BA
100%

Procedure

  1. Add IC 74LS08 into ICBase-2 (74LS08).
  2. Connect Input-8 to Pin-2 (Input) of ICBase-2 (74LS08).
  3. Connect Input-9 to Pin-1 (Input) of ICBase-2 (74LS08).
  4. Connect Output-0 to Pin-3 (Output) of ICBase-2 (74LS08).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS08).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS08).