New Circuit

Tanmay Prakash Shirke
Tanmay Prakash Shirke
Created on Oct 3, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS194 into ICBase-1 (74LS194).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS194).
  3. Connect Output-15 to Pin-19 (Output) of ICBase-1 (74LS194).
  4. Connect Output-14 to Pin-18 (Output) of ICBase-1 (74LS194).
  5. Connect Output-13 to Pin-17 (Output) of ICBase-1 (74LS194).
  6. Connect Output-12 to Pin-16 (Output) of ICBase-1 (74LS194).
  7. Connect Input-15 to Pin-13 (Input) of ICBase-1 (74LS194).
  8. Connect Input-14 to Pin-14 (Input) of ICBase-1 (74LS194).
  9. Connect GND Port to Pin-8 (Ground) of ICBase-1 (74LS194).
  10. Connect Input-10 to Pin-2 (Input) of ICBase-1 (74LS194).
  11. Connect Input-5 to Pin-7 (Input) of ICBase-1 (74LS194).
  12. Connect Clock port of 10Hz frequency to Pin-15 (Input) of ICBase-1 (74LS194).