New Circuit

divyesh
divyesh
Created on Oct 6, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS138 into ICBase-1 (74LS138).
  2. Connect Pin-20 (VCC) of ICBase-1 (74LS138) to VCC Port.
  3. Connect GND Port to Pin-7 (Output) of ICBase-1 (74LS138).
  4. Connect VCC Port to Pin-4 (Input) of ICBase-1 (74LS138).
  5. Connect Pin-6 (Input) of ICBase-1 (74LS138) to Pin-18 (Output) of ICBase-1 (74LS138).
  6. Connect Output-4 to Pin-18 (Output) of ICBase-1 (74LS138).
  7. Connect VCC Port to Pin-13 (Output) of ICBase-1 (74LS138).
  8. Connect Output-4 to Pin-15 (Output) of ICBase-1 (74LS138).