New Circuit

Ravtode KhushiP.
Ravtode KhushiP.
Created on Aug 21, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-3 (74LS74).
  2. Connect Pin-20 (VCC) of ICBase-3 (74LS74) to VCC Port.
  3. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS74).
  4. Connect Input-3 to Pin-2 (Input) of ICBase-3 (74LS74).
  5. Connect Clock port of 5Hz frequency to Pin-3 (Input) of ICBase-3 (74LS74).
  6. Connect Output-3 to Pin-5 (Output) of ICBase-3 (74LS74).
  7. Connect Output-2 to Pin-6 (Output) of ICBase-3 (74LS74).
  8. Connect VCC Port to Pin-4 (Input) of ICBase-3 (74LS74).
  9. Connect VCC Port to Pin-1 (Input) of ICBase-3 (74LS74).