New Circuit

Janvi
Janvi Jessie Naik
Created on Nov 18, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  3. Connect GND Port to Pin-17 (Ground) of ICBase-1 (74LS76).
  4. Connect Pin-4 (Input) of ICBase-1 (74LS76) to VCC Port.
  5. Connect Pin-20 (Input) of ICBase-1 (74LS76) to VCC Port.
  6. Connect Manual clock Port to Pin-1 (Input) of ICBase-1 (74LS76).
  7. Connect Manual clock Port to Pin-6 (Input) of ICBase-1 (74LS76).
  8. Connect VCC Port to Pin-2 (Input) of ICBase-1 (74LS76).
  9. Connect Pin-3 (Input) of ICBase-1 (74LS76) to VCC Port.