New Circuit

Hydra Goku
Hydra Goku
• Created on Aug 26, 2025 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-2 (74LS02).
  2. Add IC 74LS02 into ICBase-3 (74LS02).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS02).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS02).