New Circuit

Siddhi Sambhaji Kharad
Siddhi Sambhaji Kharad
• Created on Aug 5, 2025 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS83 into ICBase-1 (74LS83).
  2. Connect Pin-13 (Output) of ICBase-1 (74LS83) to Output-0.
  3. Connect Output-1 to Pin-6 (Output) of ICBase-1 (74LS83).
  4. Connect Output-2 to Pin-2 (Output) of ICBase-1 (74LS83).
  5. Connect Pin-19 (Output) of ICBase-1 (74LS83) to Output-3.
  6. Connect Input-0 to Pin-14 (Input) of ICBase-1 (74LS83).
  7. Connect Input-1 to Pin-8 (Input) of ICBase-1 (74LS83).
  8. Connect Input-2 to Pin-3 (Input) of ICBase-1 (74LS83).
  9. Connect Input-3 to Pin-1 (Input) of ICBase-1 (74LS83).
  10. Connect Pin-15 (Input) of ICBase-1 (74LS83) to Input-5.
  11. Connect Pin-7 (Input) of ICBase-1 (74LS83) to Input-6.
  12. Connect Input-7 to Pin-4 (Input) of ICBase-1 (74LS83).
  13. Connect Pin-20 (Input) of ICBase-1 (74LS83) to Input-8.
  14. Connect Input-15 to Pin-17 (Input) of ICBase-1 (74LS83).
  15. Connect Pin-16 (Ground) of ICBase-1 (74LS83) to GND Port.