New Circuit

Shraddha pund
Shraddha pund
Created on Aug 19, 2025 1 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS153).
  2. Connect GND Port to Pin-7 (Output) of ICBase-1 (74LS153).
  3. Connect Input-15 to Pin-6 (Input) of ICBase-1 (74LS153).
  4. Add IC 74LS153 into ICBase-1 (74LS153).