New Circuit

chaitanya
chaitanya kulkarni
Created on Nov 7, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-1 (74LS90).
  2. Connect Pin-5 (VCC) of ICBase-1 (74LS90) to VCC Port.
  3. Connect GND Port to Pin-16 (Ground) of ICBase-1 (74LS90).
  4. Connect Manual clock Port to Pin-1 (Input) of ICBase-1 (74LS90).
  5. Connect Output-1 to Pin-15 (Output) of ICBase-1 (74LS90).
  6. Connect Output-2 to Pin-14 (Output) of ICBase-1 (74LS90).
  7. Connect Pin-17 (Output) of ICBase-1 (74LS90) to Output-3.