New Circuit

prakarsh
prakarsh pandey
• Created on Sep 27, 2025 • 0 • 0 • 4
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Add IC 74LS11 into ICBase-3 (74LS11).
  4. Add IC 74LS32 into ICBase-4 (74LS32).
  5. Add IC 74LS04 into ICBase-5 (74LS04).
  6. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS11).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS11).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-4 (74LS32).
  10. Connect Pin-1 (Input) of ICBase-5 (74LS04) to Pin-20 (VCC) of ICBase-4 (74LS32).
  11. Connect Input-0 to Pin-1 (Input) of ICBase-5 (74LS04).
  12. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  13. Connect Manual clock Port to Pin-1 (Input) of ICBase-1 (74LS76).
  14. Connect Manual clock Port to Pin-6 (Input) of ICBase-2 (74LS76).
  15. Connect Pin-18 (Output) of ICBase-1 (74LS76) to Output-14.