New Circuit

Earl
Earl Fernandes
Created on Nov 17, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS00).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  4. Connect Input-13 to Pin-1 (Input) of ICBase-1 (74LS00).
  5. Connect Input-13 to Pin-2 (Input) of ICBase-1 (74LS00).
  6. Connect Output-12 to Pin-3 (Output) of ICBase-1 (74LS00).