New Circuit

Earl
Earl Fernandes
Created on Nov 18, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-2 (74LS74).
  2. Connect Input-0 to Pin-1 (Input) of ICBase-2 (74LS74).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS74).
  4. Connect VCC Port to Pin-4 (Input) of ICBase-2 (74LS74).
  5. Connect Seven segment display 2 to Pin-5 (Output) of ICBase-2 (74LS74).
  6. Connect Clock port of 1Hz frequency to Pin-3 (Input) of ICBase-2 (74LS74).
  7. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS74).
  8. Connect Pin-6 (Output) of ICBase-2 (74LS74) to Pin-2 (Input) of ICBase-2 (74LS74).