New Circuit

Areena
Areena Shaikh
Created on Aug 21, 2025 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-3 (74LS04).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  3. Connect Pin-20 (VCC) of ICBase-2 (74LS02) to VCC Port.
  4. Connect Pin-20 (VCC) of ICBase-3 (74LS04) to VCC Port.
  5. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS04).
  6. Add IC 74LS02 into ICBase-2 (74LS02).