New Circuit

Rutuja
Rutuja Pote
Created on Aug 25, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS151 into ICBase-1 (74LS151).
  2. Connect Input-7 to Pin-15 (Input) of ICBase-1 (74LS151).
  3. Connect Input-8 to Pin-14 (Input) of ICBase-1 (74LS151).
  4. Connect Input-9 to Pin-13 (Input) of ICBase-1 (74LS151).
  5. Connect GND Port to Pin-8 (Ground) of ICBase-1 (74LS151).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS151).
  7. Connect Pin-4 (Input) of ICBase-1 (74LS151) to GND Port.
  8. Connect Pin-3 (Input) of ICBase-1 (74LS151) to Input-10.
  9. Connect Pin-2 (Input) of ICBase-1 (74LS151) to GND Port.
  10. Connect Pin-1 (Input) of ICBase-1 (74LS151) to Input-10.
  11. Connect Pin-19 (Input) of ICBase-1 (74LS151) to Input-10.
  12. Connect Pin-18 (Input) of ICBase-1 (74LS151) to VCC Port.
  13. Connect Pin-17 (Input) of ICBase-1 (74LS151) to Input-10.
  14. Connect Pin-16 (Input) of ICBase-1 (74LS151) to VCC Port.
  15. Connect Output-7 to Pin-5 (Output) of ICBase-1 (74LS151).