New Circuit

Ganesh
Ganesh Langhi
Created on Jul 31, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS86).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS86).
  3. Connect Input-15 to Pin-1 (Input) of ICBase-1 (74LS86).
  4. Connect Input-14 to Pin-2 (Input) of ICBase-1 (74LS86).
  5. Add IC 74LS86 into ICBase-1 (74LS86).
  6. Connect Output-15 to Pin-3 (Output) of ICBase-1 (74LS86).