New Circuit

Atharva
Atharva Patil
• Created on Sep 3, 2025 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Add IC 74LS76 into ICBase-3 (74LS76).
  4. Connect Pin-5 (VCC) of ICBase-1 (74LS76) to VCC Port.
  5. Connect Pin-5 (VCC) of ICBase-2 (74LS76) to VCC Port.
  6. Connect Pin-5 (VCC) of ICBase-3 (74LS76) to VCC Port.
  7. Connect Pin-17 (Ground) of ICBase-1 (74LS76) to GND Port.
  8. Connect Pin-17 (Ground) of ICBase-2 (74LS76) to GND Port.
  9. Connect Pin-17 (Ground) of ICBase-3 (74LS76) to GND Port.