b2g

shrii
shrii bodake
• Created on Jul 29, 2025 • 0 • 0 • 1
b2g
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS86 into ICBase-1 (74LS86).
  2. Add IC 74LS86 into ICBase-2 (74LS86).
  3. Connect Output-13 to Input-13.
  4. Connect Pin-1 (Input) of ICBase-1 (74LS86) to Input-13.
  5. Connect Pin-2 (Input) of ICBase-1 (74LS86) to Input-12.
  6. Connect Output-12 to Pin-3 (Output) of ICBase-1 (74LS86).
  7. Connect Pin-1 (Input) of ICBase-2 (74LS86) to Input-12.
  8. Connect Input-11 to Pin-2 (Input) of ICBase-2 (74LS86).
  9. Connect Output-11 to Pin-3 (Output) of ICBase-2 (74LS86).
  10. Add IC 74LS86 into ICBase-3 (74LS86).
  11. Connect Pin-2 (Input) of ICBase-3 (74LS86) to Input-10.
  12. Connect Pin-1 (Input) of ICBase-3 (74LS86) to Input-11.
  13. Connect Output-10 to Pin-3 (Output) of ICBase-3 (74LS86).
  14. Connect Pin-7 (Ground) of ICBase-1 (74LS86) to GND Port.
  15. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS86).
  16. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS86).
  17. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS86).
  18. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS86).
  19. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS86).
  20. Connect VCC Port to ICBase-3 (74LS86).