A(Com)*B

Aum
Aum Mishra
• Created on Jul 16, 2025 • 0 • 0 • 2
A(Com)*B
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS00).
  4. Connect Pin-1 (Input) of ICBase-1 (74LS00) to Input-14.
  5. Connect Pin-2 (Input) of ICBase-1 (74LS00) to Input-14.
  6. Add IC 74LS08 into ICBase-2 (74LS08).
  7. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS08).
  8. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS08).
  9. Connect Pin-2 (Input) of ICBase-2 (74LS08) to Input-13.
  10. Connect Pin-1 (Input) of ICBase-2 (74LS08) to Pin-3 (Output) of ICBase-1 (74LS00).
  11. Connect Output-7 to Pin-3 (Output) of ICBase-2 (74LS08).