L2 T1 NOT

Abdullah
Abdullah Sohail
• Created on Apr 9, 2025 • 0 • 0 • 1
L2 T1 NOT
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-1 (74LS04).
  2. Connect Pin-20 (VCC) of ICBase-1 (74LS04) to VCC Port.
  3. Connect Pin-7 (Ground) of ICBase-1 (74LS04) to GND Port.
  4. Connect Input-15 to Pin-1 (Input) of ICBase-1 (74LS04).
  5. Connect Pin-2 (Output) of ICBase-1 (74LS04) to Output-15.