G to B

Heet
Heet Javiya
• Created on Mar 19, 2025 • 0 • 0 • 1
G to B
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS86).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS86).
  3. Connect Output-1 to Pin-14 (Output) of ICBase-1 (74LS86).
  4. Connect Pin-15 (Input) of ICBase-1 (74LS86) to Input-1.
  5. Add IC 74LS86 into ICBase-1 (74LS86).
  6. Connect Input-3 to Pin-1 (Input) of ICBase-1 (74LS86).
  7. Connect Pin-2 (Input) of ICBase-1 (74LS86) to Input-4.
  8. Connect Pin-4 (Input) of ICBase-1 (74LS86) to Pin-3 (Output) of ICBase-1 (74LS86).
  9. Connect Pin-3 (Output) of ICBase-1 (74LS86) to Output-3.
  10. Connect Input-2 to Pin-5 (Input) of ICBase-1 (74LS86).
  11. Connect Pin-16 (Input) of ICBase-1 (74LS86) to Pin-6 (Output) of ICBase-1 (74LS86).
  12. Connect Output-2 to Pin-6 (Output) of ICBase-1 (74LS86).
  13. Connect Output-4 to Input-4.