A

chaitany
chaitany saykar
• Created on May 2, 2025 • 0 • 0 • 1
A
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS86 into ICBase-2 (74LS86).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS86).
  3. Connect Pin-7 (Ground) of ICBase-2 (74LS86) to GND Port.
  4. Connect Pin-1 (Input) of ICBase-2 (74LS86) to Input-7.
  5. Connect Pin-2 (Input) of ICBase-2 (74LS86) to Input-9.
  6. Connect Pin-4 (Input) of ICBase-2 (74LS86) to Pin-3 (Output) of ICBase-2 (74LS86).
  7. Connect Pin-6 (Output) of ICBase-2 (74LS86) to Pin-8 (Input & Output) of ICBase-2 (74LS86).
  8. Connect Pin-6 (Output) of ICBase-2 (74LS86) to Output-7.
  9. Connect Pin-5 (Input) of ICBase-2 (74LS86) to Input-8.