exp-8-24.04.25

rushikesh
rushikesh kadam
• Created on Apr 24, 2025 • 0 • 0 • 1
exp-8-24.04.25
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-2 (74LS90).
  2. Connect GND Port to Pin-16 (Ground) of ICBase-2 (74LS90).
  3. Connect GND Port to Pin-2 (Input) of ICBase-2 (74LS90).
  4. Connect GND Port to Pin-3 (Input) of ICBase-2 (74LS90).
  5. Connect Pin-1 (Input) of ICBase-2 (74LS90) to Pin-18 (Output) of ICBase-2 (74LS90).
  6. Connect Seven segment display 2 to Pin-18 (Output) of ICBase-2 (74LS90).
  7. Connect Seven segment display 2 to Pin-15 (Output) of ICBase-2 (74LS90).
  8. Connect Pin-14 (Output) of ICBase-2 (74LS90) to Seven segment display 2.
  9. Connect GND Port to Pin-6 (Input) of ICBase-2 (74LS90).
  10. Connect GND Port to Pin-7 (Input) of ICBase-2 (74LS90).
  11. Connect Seven segment display 2 to Pin-17 (Output) of ICBase-2 (74LS90).
  12. Connect Clock port of 5Hz frequency to Pin-20 (Input) of ICBase-2 (74LS90).
  13. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS90).
  14. Connect Seven segment display 2 to ICBase-2 (74LS90).