New Circuit

atharva
atharva chavan
Created on Oct 13, 2025 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS20 into ICBase-2 (74LS20).
  2. Add IC 74LS138 into ICBase-1 (74LS138).
  3. Connect Input-14 to Pin-1 (Input) of ICBase-1 (74LS138).
  4. Connect Input-13 to Pin-2 (Input) of ICBase-1 (74LS138).
  5. Connect Input-12 to Pin-3 (Input) of ICBase-1 (74LS138).
  6. Connect GND Port to Pin-8 (Ground) of ICBase-1 (74LS138).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS138).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS20).
  9. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS20).
  10. Connect Output-6 to Pin-6 (Output) of ICBase-2 (74LS20).
  11. Connect Output-8 to Pin-14 (Output) of ICBase-2 (74LS20).