thivakar

it05
it05 A
• Created on Feb 21, 2024 • 0 • 0 • 1
thivakar
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS93 into ICBase-1 (74LS93).
  2. Connect GND Port to Pin-2 (Input) of ICBase-1 (74LS93).
  3. Connect GND Port to Pin-3 (Input) of ICBase-1 (74LS93).
  4. Connect GND Port to Pin-6 (Input & Output) of ICBase-1 (74LS93).
  5. Connect GND Port to Pin-7 (Input & Output) of ICBase-1 (74LS93).
  6. Connect Output-15 to Pin-18 (Output) of ICBase-1 (74LS93).
  7. Connect Output-14 to Pin-15 (Output) of ICBase-1 (74LS93).
  8. Connect Output-13 to Pin-14 (Output) of ICBase-1 (74LS93).
  9. Connect Output-12 to Pin-17 (Output) of ICBase-1 (74LS93).
  10. Connect GND Port to Pin-16 (Ground) of ICBase-1 (74LS93).
  11. Connect Pin-18 (Output) of ICBase-1 (74LS93) to Pin-1 (Input) of ICBase-1 (74LS93).
  12. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS93).
  13. Connect Manual clock Port to Pin-20 (Input) of ICBase-1 (74LS93).