Q2

Sreaya
Sreaya Nair
Created on Sep 2, 2023 0 0 2
Q2
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS08 into ICBase-1 (74LS08).
  2. Add IC 74LS32 into ICBase-2 (74LS32).
  3. Connect Input-8 to Pin-1 (Input) of ICBase-1 (74LS08).
  4. Connect Input-9 to Pin-2 (Input) of ICBase-1 (74LS08).
  5. Connect Pin-1 (Input) of ICBase-2 (74LS32) to Pin-3 (Output) of ICBase-1 (74LS08).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  9. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS32).
  10. Connect Input-10 to Pin-2 (Input) of ICBase-2 (74LS32).
  11. Connect Output-4 to Pin-3 (Output) of ICBase-2 (74LS32).