1st Practical DE lab - Copy - Copy

Shivansh
Shivansh Vishwakarma
Created on Aug 31, 2023 0 0 1
1st Practical DE lab - Copy - Copy
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-20 (VCC) of ICBase-2 (74LS32) to VCC Port.
  2. Connect Pin-1 (Input) of ICBase-2 (74LS32) to Input-11.
  3. Connect Input-10 to Pin-2 (Input) of ICBase-2 (74LS32).
  4. Connect Output-8 to Pin-3 (Output) of ICBase-2 (74LS32).
  5. Connect Output-7 to Pin-7 (Ground) of ICBase-2 (74LS32).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  7. Add IC 74LS32 into ICBase-2 (74LS32).