sr latch

Netal
Netal Agrawal
Created on Oct 26, 2023 2 0 1
sr latch
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS02 into ICBase-1 (74LS02).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS02).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS02).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  6. Add IC 74LS02 into ICBase-2 (74LS02).
  7. Connect Pin-2 (Input) of ICBase-1 (74LS02) to Input-15.
  8. Connect Pin-2 (Input) of ICBase-2 (74LS02) to Input-10.
  9. Connect Output-9 to Pin-1 (Output) of ICBase-2 (74LS02).
  10. Connect Output-11 to Pin-1 (Output) of ICBase-1 (74LS02).
  11. Connect Pin-1 (Output) of ICBase-2 (74LS02) to Pin-3 (Input) of ICBase-1 (74LS02).
  12. Connect Pin-1 (Output) of ICBase-1 (74LS02) to Pin-3 (Input) of ICBase-2 (74LS02).