SR latch

Nidhi
Nidhi Dasari
Created on Oct 26, 2023 0 0 1
SR latch
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS00).
  2. Add IC 74LS00 into ICBase-1 (74LS00).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  4. Connect Pin-1 (Input) of ICBase-1 (74LS00) to Input-15.
  5. Connect Pin-4 (Input) of ICBase-1 (74LS00) to Input-14.
  6. Connect Pin-2 (Input) of ICBase-1 (74LS00) to Pin-6 (Output) of ICBase-1 (74LS00).
  7. Connect Pin-5 (Input) of ICBase-1 (74LS00) to Pin-3 (Output) of ICBase-1 (74LS00).
  8. Connect Output-0 to Pin-3 (Output) of ICBase-1 (74LS00).
  9. Connect Output-1 to Pin-6 (Output) of ICBase-1 (74LS00).
  10. Connect Pin-5 (Input) of ICBase-1 (74LS00) to ICBase-1 (74LS00).