MyFirst

Noah
Noah Rodrigues
• Created on Jul 12, 2023 • 0 • 0 • 1
MyFirst
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS00).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS00).
  3. Add IC 74LS00 into ICBase-3 (74LS00).
  4. Connect Output-3 to Pin-3 (Output) of ICBase-3 (74LS00).
  5. Connect Input-2 to Pin-2 (Input) of ICBase-3 (74LS00).
  6. Connect Input-1 to Pin-1 (Input) of ICBase-3 (74LS00).