22EE08

Noah
Noah Rodrigues
• Created on Jul 12, 2023 • 0 • 0 • 1
22EE08
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (Input & Output) of ICBase-1.
  2. Connect GND Port to Pin-7 (Input & Output) of ICBase-1.
  3. Connect Input-1 to Pin-1 (Input & Output) of ICBase-1.
  4. Connect Input-2 to Pin-2 (Input & Output) of ICBase-1.
  5. Connect VCC Port to GND Port.
  6. Add IC 74LS02 into ICBase-2 (74LS02).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS02).
  8. Connect Output-1 to Pin-1 (Output) of ICBase-2 (74LS02).
  9. Connect Input-2 to Pin-2 (Input) of ICBase-2 (74LS02).
  10. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS02).
  11. Connect Input-1 to Pin-3 (Input) of ICBase-2 (74LS02).