B TO G AND G TO B

Shirish
Shirish Singh
Created on May 15, 2023 0 0 1
B TO G AND G TO B
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-7 (Ground) of ICBase-3 (74LS86) to GND Port.
  2. Connect Pin-20 (VCC) of ICBase-3 (74LS86) to VCC Port.
  3. Connect Output-2 to Input-2.
  4. Connect Pin-3 (Output) of ICBase-3 (74LS86) to Output-1.
  5. Connect Pin-2 (Input) of ICBase-3 (74LS86) to Input-1.
  6. Connect Pin-1 (Input) of ICBase-3 (74LS86) to Input-2.
  7. Connect Output-0 to Pin-17 (Output) of ICBase-3 (74LS86).
  8. Connect Pin-19 (Input) of ICBase-3 (74LS86) to Input-1.
  9. Connect Pin-18 (Input) of ICBase-3 (74LS86) to Input-0.
  10. Connect Pin-20 (VCC) of ICBase-1 (74LS86) to VCC Port.
  11. Connect Pin-7 (Ground) of ICBase-1 (74LS86) to GND Port.
  12. Connect Output-15 to Input-15.
  13. Connect Pin-3 (Output) of ICBase-1 (74LS86) to Output-14.
  14. Connect Pin-1 (Input) of ICBase-1 (74LS86) to Input-15.
  15. Connect Pin-2 (Input) of ICBase-1 (74LS86) to Input-14.
  16. Connect Pin-4 (Input) of ICBase-1 (74LS86) to Pin-3 (Output) of ICBase-1 (74LS86).
  17. Connect Pin-5 (Input) of ICBase-1 (74LS86) to Input-13.
  18. Connect Output-13 to Pin-6 (Output) of ICBase-1 (74LS86).
  19. Add IC 74LS86 into ICBase-3 (74LS86).
  20. Add IC 74LS86 into ICBase-1 (74LS86).