assignment13thapril2

Sarthak
Sarthak Mudholkar
Created on Apr 19, 2023 0 0 2
assignment13thapril2
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-3 (74LS76).
  2. Connect GND Port to Pin-17 (Ground) of ICBase-3 (74LS76).
  3. Connect VCC Port to Pin-5 (VCC) of ICBase-3 (74LS76).
  4. Connect Pin-2 (Output) of ICBase-2 (74LS04) to Pin-20 (Input) of ICBase-3 (74LS76).
  5. Add IC 74LS04 into ICBase-2 (74LS04).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).
  7. Connect Manual clock Port to Pin-1 (Input) of ICBase-3 (74LS76).
  8. Connect Input-3 to Pin-2 (Input) of ICBase-3 (74LS76).
  9. Connect Input-2 to Pin-3 (Input) of ICBase-3 (74LS76).
  10. Connect Input-6 to Pin-1 (Input) of ICBase-2 (74LS04).
  11. Connect Input-6 to Pin-4 (Input) of ICBase-3 (74LS76).
  12. Connect GND Port to Pin-6 (Output) of ICBase-2 (74LS04).
  13. Connect Output-3 to Pin-19 (Output) of ICBase-3 (74LS76).
  14. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).