Assignment3

Ved
Ved Kulkarni
• Created on Mar 29, 2023 • 0 • 0 • 1
Assignment3
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-3 (74LS76).
  2. Connect Manual clock Port to Pin-1 (Input) of ICBase-3 (74LS76).
  3. Connect Pin-2 (Input) of ICBase-3 (74LS76) to Input-2.
  4. Connect Input-1 to Pin-3 (Input) of ICBase-3 (74LS76).
  5. Connect Input-3 to Pin-4 (Input) of ICBase-3 (74LS76).
  6. Connect GND Port to Pin-13 (Input) of ICBase-3 (74LS76).
  7. Connect Input-0 to Pin-20 (Input) of ICBase-3 (74LS76).
  8. Connect Output-0 to Pin-18 (Output) of ICBase-3 (74LS76).
  9. Connect Output-1 to Pin-19 (Output) of ICBase-3 (74LS76).
  10. Connect GND Port to Pin-17 (Ground) of ICBase-3 (74LS76).
  11. Connect VCC Port to Pin-5 (VCC) of ICBase-3 (74LS76).
  12. Connect Input-2 to ICBase-3 (74LS76).