MSJK-1

Shaunak
Shaunak Dalvi
Created on Mar 14, 2023 0 0 1
MSJK-1
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-2 (74LS76).
  2. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  3. Connect Pin-2 (Input) of ICBase-2 (74LS76) to Input-7.
  4. Connect Input-6 to Pin-4 (Input) of ICBase-2 (74LS76).
  5. Connect Input-8 to Pin-3 (Input) of ICBase-2 (74LS76).
  6. Connect Manual clock Port to Pin-1 (Input) of ICBase-2 (74LS76).
  7. Connect GND Port to Pin-17 (Ground) of ICBase-2 (74LS76).
  8. Connect Input-5 to Pin-20 (Input) of ICBase-2 (74LS76).
  9. Connect Output-2 to Pin-19 (Output) of ICBase-2 (74LS76).