verify tt - Copy

Harshvardhan
Harshvardhan Misal
Created on May 7, 2023 0 0 1
verify tt  - Copy
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  2. Connect GND Port to Pin-17 (Ground) of ICBase-2 (74LS76).
  3. Connect Manual clock Port to Pin-1 (Input) of ICBase-2 (74LS76).
  4. Connect Input-0 to Pin-4 (Input) of ICBase-2 (74LS76).
  5. Connect Input-0 to Pin-20 (Input) of ICBase-2 (74LS76).
  6. Connect Output-0 to Pin-19 (Output) of ICBase-2 (74LS76).
  7. Connect VCC Port to Pin-2 (Input) of ICBase-2 (74LS76).
  8. Connect VCC Port to Pin-3 (Input) of ICBase-2 (74LS76).
  9. Add IC 74LS76 into ICBase-2 (74LS76).