CPE-LOG LAB04 OUTPUT 2C ORZO GUIA JAZLE

Guia Jazle
Guia Jazle Orzo
• Created on Oct 26, 2022 • 0 • 0 • 2
CPE-LOG LAB04 OUTPUT 2C ORZO GUIA JAZLE
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS32).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS32).
  3. Connect Pin-1 (Input) of ICBase-3 (74LS32) to Input-12.
  4. Connect Input-11 to Pin-1 (Input) of ICBase-1 (74LS04).
  5. Connect Pin-2 (Input) of ICBase-3 (74LS32) to Pin-2 (Output) of ICBase-1 (74LS04).
  6. Connect Pin-4 (Input) of ICBase-3 (74LS32) to Pin-3 (Output) of ICBase-3 (74LS32).
  7. Add IC 74LS04 into ICBase-1 (74LS04).
  8. Add IC 74LS32 into ICBase-3 (74LS32).
  9. Connect Input-10 to Pin-5 (Input) of ICBase-3 (74LS32).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS04).
  11. Connect Output-3 to Pin-6 (Output) of ICBase-3 (74LS32).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS04).