CPE-LOG no. 3 (f)

Angela
Angela Tolentino
• Created on Oct 11, 2022 • 0 • 0 • 1
CPE-LOG no. 3 (f)
100%

Integrated Circuits Used

Procedure

  1. Connect Input-8 to Pin-1 (Input) of ICBase-2 (74LS00).
  2. Connect Input-8 to Pin-2 (Input) of ICBase-2 (74LS00).
  3. Connect Input-7 to Pin-4 (Input) of ICBase-2 (74LS00).
  4. Connect Pin-5 (Input) of ICBase-2 (74LS00) to Pin-3 (Output) of ICBase-2 (74LS00).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS00).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS00).
  7. Connect Input-6 to Pin-19 (Input) of ICBase-2 (74LS00).
  8. Connect Input-6 to Pin-18 (Input) of ICBase-2 (74LS00).
  9. Connect Pin-16 (Input) of ICBase-2 (74LS00) to Pin-17 (Output) of ICBase-2 (74LS00).
  10. Connect Pin-15 (Input) of ICBase-2 (74LS00) to Pin-6 (Output) of ICBase-2 (74LS00).
  11. Connect Output-1 to Pin-14 (Output) of ICBase-2 (74LS00).
  12. Add IC 74LS00 into ICBase-2 (74LS00).