....

Subhan
Subhan Makashi
• Created on Aug 19, 2022 • 0 • 0 • 1
....
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-4 (74LS04).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-4 (74LS04).
  3. Connect Input-0 to Pin-1 (Input) of ICBase-4 (74LS04).
  4. Connect Output-2 to Pin-2 (Output) of ICBase-4 (74LS04).
  5. Add IC 74LS04 into ICBase-4 (74LS04).